Green Tag DeskStart the pilot

Fox Valley & western suburbs

Elgin: permits & requirements

01 / Current forms & packets

The five replacement jobs

Use the official application page to select the job type and current documents.

02 / Municipal fees

Town fees, separate from our prices

Fee research checked October 24, 2026.

Job typeTown fee
Furnace & AC replacementClassification to confirm
Water-heater replacementConfirm with town
Standby generatorConfirm with town
Panel & service upgradesConfirm with town
EV permit$0 — fee waived

Registrations $0-$30 ($105 electrical exam incl. first registration). Re-inspection: $195, then $500, then $770. Furnace/AC classification can change the fee; confirm the applicable row before quoting a single number.

03 / Behind the application

Registration, bond, license & COI

Elgin requires letters of intent from licensed contractors. Mechanical work requires a $20,000 bond and a qualifying HVAC license unless an applicable sealed-plan exception applies. Electrical work requires a qualifying exam-based license. Plumbing requires the Illinois plumbing-contractor license (055). Confirm all documents and insurance requirements for your scope with the city.

04 / Inspection booking

Book the final step

Email permits@ElginIL.gov or call 311 (847-931-6001 outside city limits) to request inspections. The permit identifies the required inspections.

The local reference

Fox Valley Contractor Registration & Permit Guide - free

We keep this current for clients automatically.

Get the free Guide

Try the desk

$299 for your first 30 days.

Includes your first 5 standard permits, a registration audit for your towns, and full inspection coordination. Cancel anytime. Town fees separate, at cost.

Start the $299 pilot